Vietnam.vn - Nền tảng quảng bá Việt Nam

Ho Tram - Long Thanh Airport Expressway is expected to be invested under the public-private partnership model.

(DN) - The People's Committee of Ba Ria - Vung Tau province has issued Notice No. 463/TB-UBND (dated June 20, 2025) providing information on planning and investment plans, and proposed investment options for the Ho Tram urban expressway - Long Thanh International Airport.

Báo Đồng NaiBáo Đồng Nai24/06/2025

The Ho Tram Urban Expressway - Long Thanh Airport is about 41km long. Photo: document
The expressway is expected to connect directly from the coastal road in Ho Tram area to Long Thanh Airport. Photo: document

According to this announcement, the name of the expressway is "Ho Tram Urban Expressway - Long Thanh Airport". This expressway starts at the intersection with Ring Road 4 - Ho Chi Minh City and Provincial Road 991, Phu My City; the end point is at the intersection with Provincial Road 994 (coastal road) in Xuyen Moc District.

In terms of scale, in the period of 2021-2030, invest in a complete 4-lane urban expressway, with a design speed of 100-120 km/h, complete the intersection at Ring Road 4 - Ho Chi Minh City, National Highway 56, National Highway 55 and provincial road intersections to connect with provincial roads 765, 997, 328, 994. The period after 2030 will invest with a scale of 6 lanes. The total land use area is estimated at about 365 hectares.

Regarding the form of investment, the project is expected to be invested in under the public-private partnership (PPP) method. The project is divided into component projects, including a site clearance component project implemented using public investment capital. The construction investment component project is implemented under the PPP method.

According to the People's Committee of Ba Ria - Vung Tau province, the expressway connecting Ho Tram urban area - Long Thanh airport has a total length of about 41 km; the total investment capital is expected to be about 17 trillion VND. Of which, the cost of site clearance is about 4.5 trillion VND. This is a direct connection route to Long Thanh airport, the fastest and shortest transportation option to develop the Ho Tram area more effectively. At the same time, it creates a boost for infrastructure development and strongly promotes connectivity in the Southeast region.

Pham Tung

Source: https://baodongnai.com.vn/kinh-te/202506/tuyen-cao-toc-ho-tram-san-bay-long-thanh-du-kien-dau-tu-theo-phuong-thuc-doi-tac-cong-tu-22b0b30/


Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product