Vietnam.vn - Nền tảng quảng bá Việt Nam

Pham Van Dong lane division on the first day, motorbikes flooded into the car lane

On July 4, the first day of implementing the hard barrier lane division on Pham Van Dong Street (Hanoi), traffic on the route was chaotic, motorbikes continuously entered the lane reserved for cars.

Báo Công an Nhân dânBáo Công an Nhân dân04/07/2025

On July 4, the Hanoi Department of Construction began implementing a plan to adjust traffic organization and lane division for vehicles on Pham Van Dong Street with a length of about 4km from the intersection with Hoang Quoc Viet Street to the roundabout into Ciputra urban area.

The option of a hard-barrier lane with two lanes adjacent to the median strip in each direction of the road will be for cars. The remaining lanes next to the sidewalk will be for mixed vehicles. These two groups of lanes will be separated by a hard-barrier strip, vehicles will only be allowed to change lanes at intersections and U-turn points.

Source: https://cand.com.vn/Giao-thong/phan-lan-duong-pham-van-dong-ngay-dau-xe-may-tran-vao-lan-o-to-i773704/


Comment (0)

No data
No data

Same category

Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product