Vietnam.vn - Nền tảng quảng bá Việt Nam

The coastal road section through Dong Thap province is about 25.7 km long.

(ABO) Currently, the Coastal Road Project through Tien Giang province (now Dong Thap province) connecting Long An province (now Tay Ninh province) and Ben Tre province (now Vinh Long province) phase 1 is focusing on implementing related procedures for investment implementation.

Báo Tiền GiangBáo Tiền Giang15/07/2025

Provincial leaders surveyed the starting point of the Coastal Road Project through the province.
Provincial leaders surveyed the starting point of the Coastal Road Project through the province.

According to the Management Board of Traffic Construction Investment Projects of Dong Thap Province, in general, the Coastal Road Project through the province is located in Go Cong Dong District (now in Go Cong Dong, Tan Dien, Gia Thuan communes, crossing Tien River (Cua Tieu) to Phu Tan Commune, Tan Phu Dong District (now Tan Phu Dong Commune). The route plan has been agreed upon.

Specifically, from Provincial Road 871B across the Cua Tieu River and connecting to the Cua Dai Bridge Project. The project is expected to have a total length of about 25.73 km. The starting point of the project connects to Provincial Road 871B (about 6 km from National Highway 50) located in Gia Thuan Commune; the end point connects to the bridge over the Cua Dai River (Tan Phu Dong Commune).

Regarding the scale of the project, the road section will invest in about 25.73 km of level III plain road with a scale of 4 lanes, divided into 2 phases. Specifically, phase 1 is designed according to the scale of level III plain road, 2 lanes, speed 80 km/h. Phase 2 completes 4 car lanes + 2 rudimentary lanes, with a median strip in the middle. Particularly, the bridge section will build 5 new bridges (1 large bridge, 4 medium and small bridges).

The project has been approved by the Prime Minister in Decision No. 1294/QD-TTg dated June 24, 2025. Currently, the Dong Thap Provincial Traffic Construction Investment Project Management Board is implementing related tasks in preparing the project's pre-feasibility study report.

The project is invested with the goal of forming a vertical axis connecting the coastal areas of the Mekong Delta provinces; strengthening regional connectivity, creating momentum for socio -economic development. The project will contribute to promoting the construction of green infrastructure and climate change adaptation, increasing access to public spaces and enhancing the province's capacity in planning, land management and urban adaptation to climate change.

The project will facilitate the development of the eastern industrial zone of the province.
The project will facilitate the development of the eastern industrial zone of the province.

The coastal road has an inter-regional connection, forming an economic corridor, a driving force for socio-economic development of coastal localities in the Mekong Delta in general and Dong Thap province in particular.

The investment in the construction of the coastal road combined with important traffic routes in the area such as National Highway 50, provincial roads including: 862, 871, 871B, 871C, 872B, 873, 873B, 877, 877B... creates favorable conditions for the development of the eastern industrial zone of the province with industrial parks and clusters and coastal tourist areas, contributing to promoting the socio-economic development of the province.

In addition, the project is invested to connect the coastal corridor of the province and coastal provinces of the Mekong Delta with Ho Chi Minh City; expand development space, create land fund for investment in production and business, and improve the efficiency of marine resources.

At the same time, attract investment to develop the province's eastern industrial zone, urban areas, tourism, aquaculture; strengthen security and defense. The coastal road can be combined with the Go Cong sea dike to relocate coastal residents, minimizing damage from the impact of natural disasters, climate change and rising sea levels.

During a recent survey trip, Chairman of Dong Thap Provincial People's Committee Tran Tri Quang assigned the Department of Construction to urgently complete documents and procedures for the Provincial People's Committee to submit to the Provincial People's Council for approval of the investment policy decision for the Coastal Road Project section passing through the province in July 2025.

At the same time, the Dong Thap Province Traffic Construction Investment Project Management Board is required to proactively prepare and coordinate with relevant units to carry out site clearance and resettlement work for the project.

T. DAT

Source: https://baoapbac.vn/kinh-te/202507/tuyen-duong-bo-ven-bien-doan-qua-dia-phan-tinh-dong-thap-dai-khoang-257-km-1046820/


Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product