Vietnam.vn - Nền tảng quảng bá Việt Nam

Synchronizing traffic monitoring and control system on Ho Chi Minh City Ring Road 3

The Ho Chi Minh City People's Committee proposed that the Ministry of Construction direct specialized agencies to study and provide comments on the overall design documents of the traffic monitoring and control system (ITS, ETC, KSTTX...) of the Ho Chi Minh City Ring Road 3 project.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng07/07/2025

Regarding the traffic monitoring and control work (ITS, ETC, KSTTX...) of the Ho Chi Minh City Ring Road 3 Construction Investment Project, the Ho Chi Minh City People's Committee proposed that the Ministry of Construction direct specialized agencies to study and give comments on the overall design documents of the traffic monitoring and control system (ITS, ETC, KSTTX...) of this project.

7 hTGS.jpg
Synchronizing the traffic monitoring and control system of Ho Chi Minh City's Ring Road 3. Photo: QUOC HUNG

According to the Ho Chi Minh City People's Committee, regarding the synchronous implementation and construction of works on the expressway, the Ho Chi Minh City People's Committee has directed relevant departments and units to coordinate with relevant departments and units of Dong Nai and Tay Ninh provinces to review and complete the overall design documents (according to general principles) of the traffic monitoring and control system (ITS, ETC, KSTTX...) of the Ho Chi Minh City Ring Road 3 Construction Investment Project .

Currently, the Component 1A project of the Tan Van - Nhon Trach section, invested by the My Thuan Project Management Board under the Ministry of Construction, is under construction; the component projects of the Ho Chi Minh City Ring Road 3 Construction Investment Project, managed by Ho Chi Minh City, Dong Nai, and Tay Ninh, have had their technical designs of the ITS items appraised by the specialized construction agency under the Ministry of Construction, but have not yet been implemented.

The 15.3km section of the existing My Phuoc - Tan Van road that overlaps with the Ho Chi Minh City Ring Road 3 is currently being exploited with a scale of 6-lane urban roads, and has not been invested in a synchronous scale with the Ho Chi Minh City Ring Road 3. Therefore, the investment in the traffic monitoring and control system (ITS, ETC, KSTTX...) for the Ho Chi Minh City Ring Road 3 needs to be synchronous and unified in solutions and technology for the entire route and synchronous with the expressway projects that are being invested in and constructed, in order to exploit effectively and promote investment efficiency.

The intelligent transportation system (ITS) of the Ho Chi Minh City Ring Road 3 project includes surveillance camera systems (CCTV); Vehicle detection system (VDS); Variable information sign system (VMS/LCS); Digital transmission system (DTS); Communication system (switchboard, telephone, SOS); Power supply system; Traffic management center system (TMC); Vehicle load control system (KSTTX); Electronic toll collection system (ETC).

Source: https://www.sggp.org.vn/dong-bo-he-thong-giam-sat-dieu-hanh- Giao-thong-duong-vanh-dai-3-tphcm-post802820.html


Comment (0)

No data
No data

Same tag

Same category

Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Same author

Heritage

Figure

Business

No videos available

News

Political System

Local

Product