Vietnam.vn - Nền tảng quảng bá Việt Nam

Cam Lam-Vinh Hao Expressway officially put into operation from April 26

Việt NamViệt Nam25/04/2024

On April 24, a representative of Cam Lam-Vinh Hao Expressway Joint Stock Company (Project Enterprise) said that Cam Lam-Vinh Hao Expressway will officially open the route and put it into operation to serve people traveling in both directions on the route starting from 7:00 a.m. on April 26 to serve people's travel needs during the April 30 and May 1 holidays.

According to the traffic organization plan, vehicles not allowed on the Cam Lam - Vinh Hao expressway include vehicles carrying toxic, flammable, explosive materials; specialized motorbikes with a design speed of less than 60 km/h, tractors, motorbikes, motorbikes... The investor has also built a temporary rest stop on the expressway at km113, through Nhi Ha commune, Thuan Nam district to serve people and vehicles while waiting for the official station investment. It is known that from April 26 to May 1, vehicles traveling on the route will not be charged a fee, after which it is expected to collect fees from May 2, 2024.

From 7:00 a.m. on April 26, Cam Lam - Vinh Hao expressway officially allows traffic on the route.

The expressway has an intelligent transportation system (ITS) and a synchronous management and operation team for the entire route. In particular, the route has a special tunnel of 2.25 km in length, phase 1 of which uses a two-way traffic tunnel. The tunnel operation center includes a monitoring and control complex controlled by ITS systems, playing an important role in ensuring safety and smooth traffic. Surveillance cameras installed along the route use AI technology to classify vehicles, recognize license plates, detect and warn of incidents and violations such as speeding, driving in the wrong lane, going in the wrong direction, etc. Images of vehicles are collected via cameras and transmitted to the operation center in real time for rescue, disaster relief, and violation handling.

At the meeting to inspect the acceptance of the Cam Lam - Vinh Hao Expressway on April 20, the localities also requested that the project soon coordinate with the Traffic Police Department to issue fines via the ITS system to limit traffic violations. On April 20, 2024, the State Inspection Council for Construction Acceptance approved the acceptance results of the Cam Lam - Vinh Hao Expressway project as qualified for operation and use.


Source

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product