Vietnam.vn - Nền tảng quảng bá Việt Nam

Construction of Long Khanh City's Ring Road 1 starts, costing over 1,300 billion

Báo Giao thôngBáo Giao thông21/12/2024

Long Khanh City's Ring Road 1 will surround the urban area, with both its starting and ending points connecting to National Highway 1.


On December 21, in Dong Nai province, the groundbreaking ceremony of the Long Khanh City Ring Road 1 project took place. The route is about 4.5km long, with a 14m wide road surface, and is one of the key projects of Dong Nai province and Long Khanh city.

Đồng Nai: Khởi công đường Vành đai 1 thành phố Long Khánh hơn 1.300 tỷ- Ảnh 1.

Local leaders press the button to start construction of Ring Road 1.

According to Mr. Phan Trung Hung Ha, Deputy Director of Dong Nai Department of Planning and Investment, the project has a total investment of about 1,316 billion VND, with Long Khanh City People's Committee as the investor. The project is expected to be constructed within 1 year and completed by the end of 2025.

When completed, Ring Road 1 will reduce traffic pressure on National Highway 1, complete the synchronous traffic system, and create new development space. The route is expected to effectively exploit land use potential, promote investment attraction, expand urbanization and socio -economic development for Long Khanh city.

Đồng Nai: Khởi công đường Vành đai 1 thành phố Long Khánh hơn 1.300 tỷ- Ảnh 2.

The contractor has ready vehicles and equipment to start construction immediately after the groundbreaking ceremony.

Speaking at the ceremony, Mr. Tang Quoc Lap, Vice Chairman of Long Khanh City People's Committee, said that the locality has recently prioritized investment in developing many routes, forming a synchronous urban transport system. Ring Road 1 not only contributes to realizing the Master Plan for Long Khanh City construction to 2040 and vision to 2050, but is also a driving force to promote the urbanization process, creating a highlight for the city.

The project has a starting point at the intersection with National Highway 1 (at Km1.823+870 right at Suoi Tre gas station), and an ending point at the intersection with National Highway 1 (at Km1.818+600). Including a 45m roadbed, of which the road surface is 14m, sidewalks on each side are 6m, and the central tree strip is 19m. The rainwater and wastewater drainage systems are arranged independently by culverts along both sides of the route.

Mr. Nguyen Minh Tam, Deputy Director of Dong Bac Construction and Engineering Company Limited (contractor) said that he will mobilize machinery and equipment to focus on quick construction and complete it according to plan. At the same time, he also hopes that the locality will support in clearing the land so that the construction process can be smooth.



Source: https://www.baogiaothong.vn/dong-nai-khoi-cong-duong-vanh-dai-1-thanh-pho-long-khanh-hon-1300-ty-192241221084611574.htm

Comment (0)

No data
No data
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Heritage

Figure

Business

No videos available

News

Political System

Local

Product