Vietnam.vn - Nền tảng quảng bá Việt Nam

The 1,300 billion VND steel arch bridge project in Quang Binh is unlikely to finish on schedule due to site clearance problems.

Báo Giao thôngBáo Giao thông04/07/2024


The project has a total construction length of 2.826km, of which the bridge length is 561.4m. Nhat Le 3 Bridge is an urban bridge project, permanently built with steel and prestressed reinforced concrete, the main bridge structure is an arch bridge; The total length of the bridge is 561.4m; The cross-section of the bridge is 23.5m.

The road at both ends of the bridge is designed according to the urban main road level, with a design speed of 60km/h; Roadbed width from 23.5-54.5m; Road has 4 lanes; Road surface structure is asphalt concrete on crushed stone aggregate foundation.



Source: https://www.baogiaothong.vn/du-an-cau-vom-thep-1300-ty-dong-o-quang-binh-kho-ve-dich-dung-tien-do-do-vuong-mat-bang-192240702193532337.htm

Comment (0)

No data
No data
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan

Heritage

Figure

Business

No videos available

News

Political System

Local

Product