Vietnam.vn - Nền tảng quảng bá Việt Nam

Song Bung 4 Hydropower Plant completes 2024 electricity production plan ahead of schedule

Việt NamViệt Nam02/12/2024


sb.jpg
Song Bung 4 Hydropower Plant completed its 2024 electricity production plan 30 days early. Photo: SB

This achievement recognizes the persistent efforts of the company's staff and workers and marks a proud milestone in the factory's 10-year journey of operation.

Song Bung 4 Hydropower Plant under Song Bung Hydropower Company is one of the important hydropower plants in the Vu Gia - Thu Bon river system with an installed capacity of 156MW. Put into operation since September 2014, the plant has affirmed its role in providing stable renewable energy for the Central region.

Since the beginning of 2024, the accumulation of enough water to reach the normal water level has created favorable conditions for the plant to optimize its bidding plan in the electricity market.

The bids of Song Bung Hydropower Company always closely follow the actual water source developments, ensuring that the power generation schedule is arranged reasonably by the National Electricity System and Market Operation Company Limited (NSMO).

sb2.png
Central Control Room of Song Bung 4 Hydropower Plant. Photo: SB

To achieve the above-planned results, Song Bung Hydropower Company has implemented a series of synchronous solutions, including accelerating the progress of periodic maintenance and repair, replacing old equipment with new modern technology; mobilizing the maximum number of technical staff and contractors to quickly handle defects, ensuring safe and reliable operation of generators.

In addition, complete the work of ensuring safety of dams, reservoirs and the environment according to regulations; seriously implement plans for natural disaster prevention, search and rescue according to the "4 on-site" motto; pay attention to improving the working environment, taking care of the material and spiritual life of officers and employees.

Song Bung Hydropower Company has successfully completed its assigned tasks, maximizing the advantages of water resources and ensuring stable and safe operation of the plant.



Source: https://baoquangnam.vn/thuy-dien-song-bung-4-hoan-thanh-som-ke-hoach-san-xuat-dien-nam-2024-3145206.html

Comment (0)

No data
No data
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Heritage

Figure

Business

No videos available

News

Political System

Local

Product