Vietnam.vn - Nền tảng quảng bá Việt Nam

Road connecting National Highway 1 with Ninh Thuan coastal road opens to traffic

Báo Giao thôngBáo Giao thông07/11/2024

The route is more than 13km long, connecting National Highway 1 with the coastal road, shortening the travel time from Ho Chi Minh City to tourist attractions in Ninh Thuan .


On November 7, information from the Ninh Thuan Province Traffic Project Management Board said that the Van Lam - Son Hai route has been completed, vehicles can travel from National Highway 1 to the coastal axis, Mui Dinh - Ca Na section.

Thông xe đường nối quốc lộ 1 với đường ven biển Ninh Thuận- Ảnh 1.

Panoramic view of the intersection connecting National Highway 1 to the coastal road in Ninh Thuan. (Photo: Vinh Phu)

Mr. Pham Minh Tan, Director of the Ninh Thuan Province Traffic Project Management Board (project investor) said that by early November, the entire route connecting National Highway 1 (QL1) to the coastal road had been completed with asphalt and was ready for traffic.

"Package No. 25, more than 1km long, connecting to National Highway 1, has been completely paved, allowing vehicles to circulate smoothly.

The contractor is completing sub-items such as drainage ditches and road markings to accept the project and put it into operation," said Mr. Tan.

The Van Lam - Son Hai road project connecting National Highway 1 (QL1) with the coastal road section Phu Tho - Mui Dinh has its starting point intersecting with QL1 at Km 1570+270.

The end point intersects with the coastal road at Son Hai crossroads (Phuoc Dinh commune, Thuan Nam district, Ninh Thuan).

Thông xe đường nối quốc lộ 1 với đường ven biển Ninh Thuận- Ảnh 2.

Guide sign at the intersection connecting to National Highway 1.

The project has a total length of more than 13km, with a total investment of more than 372 billion VND, passing through two communes of Phuoc Nam and Phuoc Dinh.

By the end of 2023, most of the packages will have been completed. In particular, package 25 connecting to National Highway 1 through a residential area is progressing slowly due to the locality's slow handover of the site.

Thông xe đường nối quốc lộ 1 với đường ven biển Ninh Thuận- Ảnh 3.

The open route shortens the journey from National Highway 1 to the coastal axis of Ninh Thuan.

According to the Commander of Package 25, the package will officially hand over the site by June 2024. The province has extended the completion time to the third quarter of 2024. To complete the project, the contractor is working overtime and the construction team is working continuously to open the route soon.

Van Lam - Son Hai Road is more than 13km long. Once put into operation, it will be a driving force to promote the transportation of goods connecting with National Highway 1, the North-South railway and the North-South expressway, forming an inter-regional traffic network and opening up a new development direction for the southern economic region of Ninh Thuan province.



Source: https://www.baogiaothong.vn/thong-xe-duong-noi-quoc-lo-1-voi-duong-ven-bien-ninh-thuan-192241107123428337.htm

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product