Vietnam.vn - Nền tảng quảng bá Việt Nam

Petrolimex Joint Venture wins bid for Mai Son Expressway Rest Stop Project

Việt NamViệt Nam22/06/2024


Petrolimex Joint Venture wins bid for Mai Son Expressway Rest Stop Project - National Highway 45

The North-South Expressway East Rest Stop, Mai Son - National Highway 45 section, is located on both sides at Km 329+700 in Dong Hoa commune, Dong Son district, Thanh Hoa province.

Illustration photo.
Illustration photo.

The Director of the Vietnam Expressway Administration has just signed a decision approving the results of the selection of investors for the investment project to build and operate the Km329+700 rest stop under the Mai Son - National Highway 45 component project on the North-South expressway, Eastern section.

Accordingly, the winning investor is the Petrolimex Joint Venture (Joint Venture of Vietnam National Petroleum Group - Thua Thien Hue Petroleum Company); the value in cash paid to the state budget is 111 billion VND; the preliminary value of the project implementation cost (M1) is 201.685 billion VND; the value of compensation, support, and resettlement (M2) is 10.454 billion VND.

The overall progress of the Mai Son - National Highway 45 Rest Stop Project is 17 months, of which the completion time for public service works is 11 months. The project exploitation time after completing the investment work is 25 years.

The Ministry of Transport assigns the Thang Long Project Management Board, as the inviting party, based on the approved investor selection results, to organize the implementation of the next steps in compliance with the provisions of the Bidding Law and Decree No. 23/2024/ND-CP.

During the implementation process, note to negotiate with the winning Investor to shorten the progress of public works to serve the essential needs of people and vehicles participating in traffic on the route and other notes stated in the Appraisal Report of the Appraisal Team.

Rest stop location The Mai Son - National Highway 45 rest stop project is located on both sides at Km 329+700 in Dong Hoa commune, Dong Son district, Thanh Hoa province, in which the station on the right side of the route has a total area of about 39,184m2 and the station on the left side of the route has a total area of about 32,473m2.

The expected construction items include: public service works, providing free services (parking lots, resting spaces, temporary rest rooms for drivers, toilets, information provision areas, places to organize and launch traffic safety propaganda, places for rescue workers, first aid for traffic accidents); commercial service works (food and beverage service areas, areas for introducing and selling goods, fuel stations, electric vehicle charging stations, vehicle maintenance and repair workshops, car washes; restaurants, entertainment areas, other essential services to meet the needs of the people); auxiliary works that are symbols of the locality or of rest stops.

Source: https://baodautu.vn/lien-danh-petrolimex-trung-thau-du-an-tram-dung-nghi-cao-toc-mai-son—quoc-lo-45-d218293.html


Comment (0)

No data
No data
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Heritage

Figure

Business

No videos available

News

Political System

Local

Product