Vietnam.vn - Nền tảng quảng bá Việt Nam

Adjusting the planning for renovation and construction of new housing areas serving land acquisition and clearance in Long Bien

Báo Kinh tế và Đô thịBáo Kinh tế và Đô thị12/09/2024


According to the Decision, the land plot marked CT2 is located in Long Bien ward, Long Bien district; the North borders Co Linh street, the West borders the existing street, the remaining sides border the land plot with green space function. The scale of the study to establish local adjustments to the detailed planning has an area of about 13,953 m2.

The adjustment objective is to concretize the Master Plan for the Capital Construction to 2030 with a vision to 2050; the N10 urban subdivision plan at a scale of 1/2,000 approved by competent authorities; exploit and effectively use land funds, improve utilities, improve apartment quality, improve living conditions, increase investment efficiency, contribute to increasing supply for the real estate market; serve as a legal basis for establishing construction investment projects according to approved plans and as a basis for management agencies and local authorities to manage construction according to the provisions of law.

Accordingly, the total floor area will be adjusted to increase (The proposed basement construction area is 8,293m2, including 3,340m2 of the 9,000m2 planned land area for gardens, trees, walking paths, a part below is the basement (in addition to the auctioned area), land use coefficient, basement boundary; adding 01 basement. The scale and function of specific items in the project will be specified in the basic design phase, investment project implementation, ensuring compliance with the planning criteria identified in the project, complying with national technical regulations and other relevant current legal regulations.

The City People's Committee assigned the Department of Planning and Architecture to confirm the documents and drawings for Local Adjustment of the Detailed Planning at a scale of 1/500 for Renovation and new construction of the Housing Area serving the project of site clearance and preliminary leveling of the land for auction of land use rights in Long Bien ward at the land plot coded CT2.

Long Bien District People's Committee presides, coordinates and organizes the public announcement of local adjustments to the approved detailed planning so that relevant organizations, agencies and people can know and implement.

Long Bien District People's Committee, Long Bien Ward People's Committee and the Department of Construction Inspectorate are responsible for inspecting and supervising construction according to approved planning, handling cases of construction in violation of planning according to their authority and regulations of law.



Source: https://kinhtedothi.vn/dieu-chinh-quy-hoach-cai-tao-xay-moi-khu-nha-phuc-vu-gpmb-o-long-bien.html

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product