Vietnam.vn - Nền tảng quảng bá Việt Nam

Arrange 81 billion VND to repair National Highway 7 through Nghe An in 2025

Báo Giao thôngBáo Giao thông29/09/2024


According to voters in Tuong Duong and Ky Son districts ( Nghe An province), National Highway 7 passing through the area has many narrow, degraded sections that obstruct visibility and pose a potential risk of traffic accidents.

From there, voters proposed upgrading and expanding National Highway 7 to meet people's traffic needs and ensure traffic safety.

Bố trí 81 tỷ đồng sửa chữa quốc lộ 7 qua Nghệ An trong năm 2025- Ảnh 1.

According to the Ministry of Transport , it is expected to allocate about 81 billion VND to repair National Highway 7 through Nghe An in 2025 (illustrative photo).

According to the Ministry of Transport, according to the Road Network Planning for the 2021-2030 period, with a vision to 2050, National Highway 7 through Nghe An province is 225km long, level III-IV scale, 2-4 lanes.

Currently, the Ministry of Transport has been investing in a level III - IV scale, 2 - 4 lanes according to the plan, in which the section through Tuong Duong and Ky Son districts is about 108km long, with a scale of 2 lanes.

"Due to resource difficulties, the Ministry of Transport has not been able to allocate capital to invest in National Highway 7 passing through Tuong Duong and Ky Son districts in the 2021-2025 period.

The Ministry of Transport acknowledges the voters' recommendations. In the process of developing a medium-term public investment plan for the 2026-2030 period, based on the ability to balance resources and the principles of capital allocation according to regulations, the Ministry of Transport will consider reporting to the competent authority to invest in National Highway 7," said the Ministry of Transport.

In the immediate future, to meet the travel needs of the people, the Ministry of Transport has assigned the Vietnam Road Administration to repair a number of works and fix damage to traffic infrastructure in 2022, 2023, and 2024 with a budget of about 114 billion VND. In 2025, it is expected to continue to allocate about 81 billion VND for maintenance and repair, ensuring safe and convenient operation on the route.



Source: https://www.baogiaothong.vn/bo-tri-81-ty-dong-sua-chua-quoc-lo-7-qua-nghe-an-trong-nam-2025-192240928230115643.htm

Comment (0)

No data
No data
First images of transport planes forming formation to practice for the September 2nd parade
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product