Vietnam.vn - Nền tảng quảng bá Việt Nam

[Photo] Stunning Vung Ang-Bung Expressway before opening day

Only one day left until the opening of the Vung Ang-Bung expressway, the vital route connecting Ha Tinh with Quang Tri. Along the 55km-long route, there are roads that pass through Deo But mountain or the winding section around Kim Son reservoir, creating a poetic and majestic landscape that this road passes through.

Báo Nhân dânBáo Nhân dân17/08/2025

ndo_br_2a.jpg
The project's starting point is at the intersection with National Highway 12C, connecting with Ham Nghi-Vung Ang Expressway in Ky Hoa Commune, Ha Tinh Province and the end point is in Bo Trach Commune, Quang Tri Province, connecting with Bung-Van Ninh Expressway.
ndo_br_11a.jpg
In the old Ky Anh district and old Ky Anh town of Ha Tinh province, this highway passes through complex terrain such as mountains and lakes.
ndo_br_10a.jpg
On August 19, Vung Ang-Bung is one of the components of the North-South Expressway project that will be technically opened to traffic according to the direction of the Prime Minister and the Ministry of Construction .
ndo_br_25a.jpg
After paving the bridge with asphalt concrete, the contractor will continue to complete the installation of median strips and construction of expansion joints. Hoa Binh 479 Joint Stock Company - the contractor of bridge No. 1, expects to complete the entire project before the project opens to traffic.
ndo_br_13a.jpg
Most sections on the Vung Ang-Bung expressway have been installed with railings, guardrails, painted lines and traffic signs.
ndo_br_15a.jpg
The Vung Ang-Bung Expressway passes through mountainous terrain, so at locations at risk of landslides, measures to prevent landslides and landslides on the route are being implemented.
ndo_br_12a.jpg
Deo But road tunnel through Deo But mountain belongs to Vung Ang-Bung expressway project.
ndo_br_27a.jpg
These days, hundreds of engineers and workers are working overtime and "sprinting" at the Vung Ang-Bung expressway construction site (part of the North-South expressway construction project in the East phase 2021-2025) in hot weather to meet the traffic opening deadline on August 19.
ndo_br_19a.jpg
The roads and viaducts leading to Deo But tunnel have also been gradually completed with the installation of median strips, guardrails, road markings, traffic signs and lighting systems.
ndo_br_21a.jpg
Deo But road tunnel has also completed lighting and safety items inside the tunnel. Deo But tunnel is nearly 1 km long with 2 tunnels designed, in which the left tunnel is 716m long, the right tunnel is 840m long, each tunnel is 15m wide, 8m high.
ndo_br_22a.jpg
But Pass is the only road tunnel in the more than 107km long North-South Expressway in the east of Ha Tinh province. The project is invested by Project Management Board 6 (Ministry of Transport, now the Ministry of Construction).
ndo_br_22a-7459.jpg
Deo But Tunnel - the most important item on the Vung Ang-Bung expressway is nearly one kilometer long, with an investment capital of more than 1,000 billion VND. The tunnel passes through the Dong Nang mountain range in Ha Tinh, and is designed with two tubes, the left tunnel is 45 meters away from the right tunnel. The left tunnel is 716 meters long, the right tunnel is 840 meters long, each tunnel is 15 meters wide and 8 meters high.
ndo_br_17a.jpg
These days, hundreds of engineers and workers are working overtime and "sprinting" at the Vung Ang-Bung expressway construction site (part of the North-South expressway construction project in the East phase 2021-2025) in hot weather to meet the deadline for traffic opening on August 19.
ndo_br_11a-9715.jpg
When the Vung Ang-Bung expressway is put into operation, it will bring many great and multi-dimensional benefits; shortening travel time between Quang Binh, Ha Tinh and the northern provinces. This creates extremely favorable conditions for trade, freight transport and tourism development.
ndo_br_1a.jpg
The winding highway along Kim Son reservoir (capacity of 17.5 million m3 of water), located in Ky Hoa commune, creates a poetic and majestic scene.
ndo_br_19a-5956.jpg
Bridge No. 1 is about 942m long, a large bridge spanning over rugged mountainous areas, with many high pillars and crossing deep valleys. This is considered one of the most difficult construction items of the project.
ndo_br_21a-9778.jpg
The overpass over Kim Son lake area with beautiful scenery on the Vung Ang-Bung highway in the late afternoon.
ndo_br_18a.jpg
This bridge consists of 22 spans, with piers 30-50m high, nearly 1km long, connecting two hills, across a valley with rugged terrain.
ndo_br_17a-3473.jpg
The majestic and beautiful scenery that the Vung Ang-Bung highway passes through.

Source: https://nhandan.vn/anh-tuyet-dep-tuyen-duong-cao-toc-vung-ang-bung-truoc-ngay-thong-xe-post901490.html


Comment (0)

No data
No data
See beautiful photos taken by flycam by photographer Hoang Le Giang
Visit Nha Xa silk village
When young people tell patriotic stories through fashion
More than 8,800 volunteers in the capital are ready to contribute to the A80 festival.
The moment the SU-30MK2 "cuts the wind", air gathers on the back of the wings like white clouds
'Vietnam - Proudly Stepping Forward to the Future' Spreads National Pride
Young people hunt for hair clips and gold star stickers for National Day holiday
See the world's most modern tank, suicide UAV at the parade training complex
The trend of making cakes printed with red flag and yellow star
T-shirts and national flags flood Hang Ma Street to welcome the important holiday

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product