Vietnam.vn - Nền tảng quảng bá Việt Nam

Request to overcome shortcomings on Cam Lam - Vinh Hao expressway

On June 25, information from the Road Management Office IV.1, Vietnam Road Administration (Ministry of Construction) said that the unit coordinated with Cam Lam - Vinh Hao Expressway Joint Stock Company and related units to inspect and discover a number of shortcomings on the Cam Lam - Vinh Hao Expressway (passing through 3 provinces of Khanh Hoa, Ninh Thuan and Binh Thuan).

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng26/06/2025

Rest stop
Rest stop "withered" on Vinh Hao - Phan Thiet highway

Specifically, at Cam Lam - Vinh Hao toll station (Km133+750, from Cam Lam to Phan Thiet), the inspection team found that flexible pillars and lane markings had been installed at the station; speed limit signs were installed in the area before entering the toll station.

However, traffic collisions often occur in this area, especially when vehicles run out of money in their VETC accounts and cannot stop in time, leading to collisions with the toll station barrier.

The inspection team requested the project enterprise to add evenly spaced speed bumps from Km133+600 - Km133+700; move sign P.127 (maximum speed allowed 60km/h) at Km133+450 to Km133+200; move sign P.127 (maximum speed allowed 70km/h) at Km133+200 to Km132+950.

Checking at the Km112+900 rest stop on the Cam Lam - Vinh Hao expressway which is temporarily in operation, Cam Lam - Vinh Hao Expressway Joint Stock Company (the unit managing and operating the Cam Lam - Vinh Hao expressway) proposed to temporarily suspend operation for 30 days to carry out repairs, upgrades, add food services, vehicle repair and maintenance...

Regarding this issue, the inspection team requested Cam Lam - Vinh Hao Expressway Joint Stock Company to publicly disclose information and operation stoppage time on mass media so that people and vehicles participating in traffic know and are proactive in moving; requested the project enterprise to complete legal procedures and organization work to ensure traffic safety for people and vehicles, and submit to the Vietnam Road Administration for consideration and approval.

Previously, on June 25, SGGP Newspaper published an article “Vinh Hao - Phan Thiet Expressway: Peeling roads, “deserted” rest stops”, reflecting many shortcomings on the route with a total investment of more than 10,000 billion VND.

Source: https://www.sggp.org.vn/yeu-cau-khac-phuc-bat-cap-tren-tuyen-cao-toc-cam-lam-vinh-hao-post801128.html


Comment (0)

No data
No data
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people

Heritage

Figure

Business

No videos available

News

Political System

Local

Product