Vietnam.vn - Nền tảng quảng bá Việt Nam

Building a plan to run trains together on urban and national railways

Báo Giao thôngBáo Giao thông24/08/2023


Identify investment priorities

The Ministry of Transport announced the conclusion of the meeting of Deputy Minister Nguyen Danh Huy at the meeting to give comments on the initial report on planning of railway routes and stations in the key area of Hanoi city.

Accordingly, the Deputy Minister requested the consultant to continue investigating and surveying to collect all relevant information; fully absorb the opinions of agencies and units to complete the planning project.

In particular, it is necessary to ensure compliance with the national master plan, specify national sectoral planning; overcome current shortcomings in focal planning; save land funds, and be consistent with local planning.

At the same time, synchronously connect national railways with urban railways and other modes of transport, paying attention to connecting railways with large-volume transport hubs (industrial parks, dry ports, logistics centers, etc.) in the capital region and the Red River Delta to serve the socio -economic development of the region and localities.

img

The Ministry of Transport requires consultants to promptly complete the planning report, develop station plans, and determine investment priorities (Photo: illustration).

The consultant must continue to update information and input data such as: Current status of natural conditions, socio-economic conditions, land use, transportation, etc.; land use planning, urban areas, transportation, industrial parks, dry ports, logistics centers in localities related to the Hanoi city hub area. Update related projects: Ring Road 3, 4 project of Hanoi city; Eastern belt railway project of Hanoi city; Hanoi urban railway project, line 1 Yen Vien - Ngoc Hoi; High-speed railway project on the North - South axis...

The data must be complete and accurate, serving as a basis for research and proposing appropriate planning options. Work specifically, conduct field inspections with the locality and review the provincial planning to update detailed information at Ngoc Hoi, Lac Dao, Yen Thuong stations...

“Soon complete the investigation and survey work to collect input data, especially the survey of traffic demand (departure points, destination points, transportation demand at hubs, transportation density on routes, railway lines, etc.). From the survey of traffic demand, combine with updating the provincial planning to develop train operation plans, arrange stations, station scale and determine appropriate investment priorities,” the Deputy Minister directed.

Optimizing train organization plan

Deputy Minister Nguyen Danh Huy also requested consulting to develop an optimal train organization plan for the stages of forming the railway network in the Hanoi city hub, including the organization of exploitation and joint train operation between urban railways and national railways; research on inter-regional train operation for the belt railways.

The study proposes synchronous, modern and open technological and engineering solutions to ensure convenient and effective connection of railway lines in the hub area, including the connection of national railways with urban railways. For existing railway lines, it is necessary to develop an electrification roadmap in line with Vietnam's commitment at COP26.

img

The Ministry of Transport requests consulting, research, and proposal of plans to organize train operations and jointly exploit urban and national railway infrastructure (Photo: illustration).

For stations, consultants need to clarify functions and tasks; propose transport connection solutions, especially public transport such as urban railways and buses; connect technical infrastructure to ensure the ability to clear passengers and goods during rush hours; specifically determine the scale and area of construction items and the entire station area.

"The research results must propose an overall network of routes, routes, all stations in the hub area, and an exploitation organization plan; in which, attention must be paid to the joint exploitation of national railway infrastructure with urban railways," Deputy Minister Huy requested.

img


Source: https://www.baogiaothong.vn/xay-dung-phuong-an-chay-chung-tau-duong-sat-do-thi-duong-sat-quoc-gia-192601619.htm

Comment (0)

No data
No data
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product