Vietnam.vn - Nền tảng quảng bá Việt Nam

Overview of the extended Le Quang Dao route connecting two districts that is about to be completed in Hanoi

Báo Dân ViệtBáo Dân Việt27/08/2024


Overview of the 700 billion VND road connecting 2 districts about to be completed in Hanoi

Tuesday, August 27, 2024 09:56 AM (GMT+7)

The extended Le Quang Dao Street is one of the key projects of Hanoi. The route plays a role in connecting the two districts of Nam Tu Liem and Ha Dong. Currently, the project has reached nearly 80% progress and is expected to be inaugurated on the occasion of the 70th anniversary of the Liberation of the Capital (October 10, 2024).

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 1.

The extended Le Quang Dao Street is over 2.6 km long, with a total investment of over 740 billion VND. Of which, the site clearance cost over 163 billion VND, construction and installation cost over 542 billion VND and some other costs.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 2.

The starting point connects with Le Quang Dao Street and Thang Long Avenue (in Me Tri Ward, Nam Tu Liem District).

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 3.

According to the design, the route will have inter-regional road standards, with a design speed of 60km/h. The typical cross-section of the road is 40m, the section connecting to Thang Long Avenue (about 110m long) has a cross-section width of 100m. Recorded on the morning of August 26, about 1km of the first route from Thang Long Avenue to Dai Linh Street (Me Tri Ward) has been completed.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 4.

This road section is paved with stone sidewalks, asphalt pavement, trees, lighting system and fire fighting water supply system...

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 5.

Flowers are planted between the median strip.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 6.

The end point of the route connects with the existing route at Duong Noi (Ha Dong), creating a smooth traffic axis, reducing the load on To Huu and Nguyen Trai - Tran Phu routes.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 7.

Currently, the remaining section from Sa Doi Street to the end of the route is still messy, the road surface structure is not complete.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 8.

According to research, the heavy rain has greatly affected the construction work.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 9.

To ensure drainage, the sewer system is designed with a large diameter, running throughout the road, and also collecting water from branch lines.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 10.

On the route there is also a bridge over the Nhue River whose main structures have been completed.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 11.

A worker here said that on rainy days, workers cannot construct the roadbed structure and can only focus on safety and sidewalk items.

Toàn cảnh tuyến đường Lê Quang Đạo kéo dài nối 2 quận sắp hoàn thành ở Hà Nội- Ảnh 12.

The project is expected to be inaugurated on the occasion of the 70th anniversary of the Liberation of the Capital (October 10, 2024).

Pham Hung



Source: https://danviet.vn/toan-canh-tuyen-duong-le-quang-dao-keo-dai-noi-2-quan-sap-hoan-thanh-o-ha-noi-20240826134643032.htm

Comment (0)

No data
No data
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product