Vietnam.vn - Nền tảng quảng bá Việt Nam

Information about Vingroup's 22,600 billion VND super project in Dan Phuong district

Báo Dân tríBáo Dân trí02/03/2025

(Dan Tri) - Vingroup 's Green City project in Dan Phuong district (Hanoi) has an area of about 126 hectares, total capital of 22,666 billion VND, expected to complete construction in June 2030, officially operating from January 2031.


Vingroup Corporation - JSC has just released an environmental impact assessment report of the urban functional area project in Tan Hoi, Lien Trung, Tan Lap and Lien Ha communes - Green City (Dan Phuong district, Hanoi ).

According to the report, in June 2017, the Hanoi People's Committee approved the investment policy of this group and approved the investor of the Urban Functional Area in Tan Hoi Commune, Lien Trung Commune, Tan Lap Commune, Lien Ha Commune, Dan Phuong District - Green City.

The project has a total area of 125.7 hectares. Regarding the scope and boundaries of the project, the Northeast borders a 40m wide planned road; the Southwest borders a 24m wide inter-commune road; the Southeast borders a 50m wide planned road; the Northwest borders a 40m wide planned road.

The current status of the project is more than 77 hectares of rice land; 10.3 hectares of tree land; 13.5 hectares of vacant land; 13.5 hectares of water surface land; the rest is crop land, asphalt roads, cemeteries... In general, the project area is mainly agricultural land, vacant land and in addition there is industrial land for craft villages, service mechanism land, rural residential land.

Thông tin về siêu dự án 22.600 tỷ đồng của Vingroup tại huyện Đan Phượng - 1

Perspective of Urban Functional Area project - Green City (Photo: Investor).

The housing category in this project will include a low-rise residential area with 124 4-storey apartments, construction density of 67-75%; high-rise buildings and mixed-use buildings on plots HH2e, HH4, HH5 and HH6.

In which, HH2e land lot includes 6 buildings 35 floors high, construction density 40%, with 3 basements and 7-storey podium, developing 140 officetels, 224 apartments and 560 hotel rooms.

Plot HH4 will consist of 6 towers 28-35 stories high, with 3 basements and a 7-story podium, with a construction density of 40%. There will be 420 residential apartments, 308 officetels and 448 hotel rooms.

Plots HH5 and HH6 are shophouses with 7-storey buildings, construction density 50%, including 5 floors for commercial services and 2 floors for housing.

The total investment of this project is 22,666 billion VND. The construction progress is expected from July 2024 to June 2030, trial operation from July 2030 to December 2030; from January 2031 the project will be officially put into operation.



Source: https://dantri.com.vn/bat-dong-san/thong-tin-ve-sieu-du-an-22600-ty-dong-cua-vingroup-tai-huyen-dan-phuong-20250301014426386.htm

Comment (0)

No data
No data
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region
Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan

Heritage

Figure

Business

No videos available

News

Political System

Local

Product