EVNNPC General Director Nguyen Duc Thien and the working delegation inspected the situation and directed the damage recovery work after storm No. 5 in Thanh Hoa .
On August 26, General Director of the Northern Power Corporation (EVNNPC) Nguyen Duc Thien and his delegation directly inspected and worked with Thanh Hoa Power Company (PC Thanh Hoa) on response and recovery work after storm No. 5.
Storm No. 5 caused many old trees in the province to fall and damaged property on the power grid managed by PC Thanh Hoa.
According to statistics, by 5:00 p.m. on August 26, the power grid system of Thanh Hoa PC was severely damaged by storm No. 5 with: 577 medium and low voltage poles broken, cracked or collapsed; 1 damaged transformer; 1,324 meters of medium voltage wire and 740 meters of low voltage wire broken or damaged; 140 medium voltage bushings, 96 low voltage bushings, 23 meters and 30 meter boxes damaged. Currently, 18/166 communes, corresponding to 96,412 customers, have not had their power restored.
Thanh Hoa PC Disaster Prevention and Search and Rescue Command Committee and contractors and construction units met to discuss incident handling plans.
Faced with the impacts of natural disasters, Thanh Hoa Power Company held a meeting of the Company's Disaster Prevention and Search and Rescue Command Committee with the participation of contractors and construction units. At the meeting, Thanh Hoa Power Company agreed to mobilize all human resources, vehicles, materials and equipment to simultaneously respond to the incident. Along with the response work, the unit continues to promote electrical safety propaganda to the people, maintain uninterrupted communication with the Control Center and enhance quick interaction with customers. It is expected that by the end of August 27, 2025, all affected customers will have their power restored, demonstrating the strong determination of Thanh Hoa Power Company and the Northern Power Industry.
After directly inspecting and listening to the report on the damage caused by natural disasters on Thanh Hoa's power grid, Mr. Nguyen Duc Thien, General Director of the Northern Power Corporation, praised Thanh Hoa Power Company for closely following the situation, reporting promptly and effectively responding to the damage caused by storm No. 5.
Thanh Hoa PC workers deploy to fix the problem.
Mr. Nguyen Duc Thien emphasized that restoring power supply is an urgent task but safety must be put first. In the context of heavy rain, flash floods and landslides that are still lurking, units need to closely monitor water levels to promptly plan power cuts, operate flexibly, and ensure safety for people and construction workers. At the same time, it is necessary to proactively provide materials, equipment, means and human resources to restore power to key areas, essential infrastructure and important customers; develop appropriate plans for flooded and isolated areas.
Thanh Hoa PC deployed to replace broken electric poles.
EVNNPC General Director requested Thanh Hoa PC to strengthen coordination with local authorities, update information regularly for timely direction; promote the spirit of mutual support within the organization and be ready to support Nghe An and Ha Tinh when needed. He also called on contractors to join in speeding up the recovery process, especially to ensure electricity for the National Day holiday. EVNNPC will create all favorable conditions for the recovery work to take place quickly and effectively.
Thanh Hoa PC workers deploy to fix the problem.
On the same day, Mr. Vu The Nam - Member of the Board of Members and Mr. Luong Minh Thanh - Deputy General Director of EVNNPC also directly inspected the scene. After the survey, the leaders of the Corporation requested the units to immediately deploy all plans when safety conditions allow, focusing on temporary power supply to quickly reduce the number of customers without power. The Power Management Teams must be proactive in their work, flexibly coordinate with contractors to speed up progress. At the same time, there must be a focal point to summarize the damage, regulate materials reasonably, and make detailed plans for each area. For mountainous areas and areas isolated by floods, there must be separate plans suitable to actual conditions.
Hung Manh (PC Thanh Hoa)
Source: https://baothanhhoa.vn/huy-dong-toan-luc-khac-phuc-thiet-hai-som-cap-dien-tro-lai-cho-khach-hang-259638.htm
Comment (0)