Vietnam.vn - Nền tảng quảng bá Việt Nam

Proposal to invest in 14km of National Highway 60 from Dai Ngai Bridge to Soc Trang center

Báo Giao thôngBáo Giao thông15/11/2024

Project Management Board 85 (Ministry of Transport) - the investor of Dai Ngai bridge project worked with Soc Trang province on the investment proposal for 14km of National Highway 60, connecting the project to Soc Trang city.


On November 15, Project Management Board 85 had a meeting with leaders of Soc Trang province to discuss the new investment in National Highway 60, connecting from Dai Ngai Bridge project to Soc Trang city.

Đề xuất đầu tư 14km quốc lộ 60 từ cầu Đại Ngãi đến trung tâm Sóc Trăng- Ảnh 1.

National Highway 60, section through Long Duc commune, Long Phu district.

The report of Project Management Board 85 shows that Dai Ngai bridge on National Highway 60 through two provinces of Tra Vinh and Soc Trang has a total investment of 7,962 billion VND.

To date, after reviewing the implementation costs, the remaining amount of the project is about 1,752 billion VND. On that basis, the investor has studied new investment in the National Highway 60 section, according to the locality's proposal.

Accordingly, this national highway section will connect from Dai Ngai bridge to Soc Trang city belt road, with an estimated length of over 14km, in accordance with the provincial traffic planning.

The starting point of the new national highway is at the intersection of Nam Song Hau road (coinciding with the end point of Dai Ngai bridge) in Long Duc commune (Long Phu district).

This route will pass through Long Duc commune, Tan Thanh commune of Long Phu district. The end point is at National Highway 60 (in Ward 5, Soc Trang city) intersecting with the National Highway 60 bypass, the section passing through An Nghiep industrial park.

Phase 1 for the road and bridges on the route is a two-lane, grade III plain road, with a design speed of 80km/h, with a total investment of 1,870 billion VND.

In addition, the investor also proposed some contents about Dai Ngai bridge such as source of sand materials; site clearance work...

At the meeting, Mr. Lam Van Man, Secretary of Soc Trang Provincial Party Committee, agreed with the investor on the construction plan proposed by the unit.

At the same time, the Provincial People's Committee and the Department of Transport are assigned to coordinate with relevant units to promptly send a document to the Ministry of Transport requesting early consideration and investment in the project.

In addition, the Department of Natural Resources and Environment is assigned to ensure the source of sand materials for the construction of Dai Ngai 2 Bridge and the project to build the section from Dai Ngai Bridge (phase 2) connecting to the belt road in the province.

In addition, relevant departments and branches coordinate with Long Phu District People's Committee to thoroughly resolve arising problems related to site clearance.



Source: https://www.baogiaothong.vn/de-xuat-dau-tu-14km-quoc-lo-60-tu-cau-dai-ngai-den-trung-tam-soc-trang-192241115204105063.htm

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product