Vietnam.vn - Nền tảng quảng bá Việt Nam

Hai Phong's 'super luxury' administrative headquarters welcomes officials and residents on first day

The Political - Administrative Center and the Conference - Performance Center projects, built in the North Cam River Urban Area, are considered two century-old projects of Hai Phong City. These two projects were started in January 2023, with a total investment of more than 5,000 billion VND.

VietNamNetVietNamNet01/07/2025

The Hai Phong City Political - Administrative Center building project was started on January 7, 2023, with a total investment of more than VND 2,831 billion, built on an area of ​​13.63 hectares, including 14 blocks of buildings designed symmetrically along the two axes North - South and East - West. Of which, 4 blocks of 3-storey buildings, 4 blocks of 4-storey buildings, 4 blocks of 5-storey buildings and 2 blocks of 15-storey buildings.

The project is located in Thuy Nguyen City (old), on Do Muoi Street with a scale of 10 lanes. The east of the project borders the central urban area of ​​Hai Phong; the west connects directly to Hai Duong (old); the north borders Quang Ninh, with potential for expansion and regional connectivity; the south is located near the core urban area of ​​Hai Phong, both maintaining connections with the seaport and avoiding pressure from urban overload.

The new administrative area is located in the important economic center of Hai Phong with a large industrial park system and a strong orientation for industrial and service development, capable of playing a coordinating role in economic development for the entire city. The highlight is two 15-storey buildings located symmetrically with a maximum height of 74.4m, gradually lowering towards the inside, creating a converging highlight.

In addition to the main building, in front of the building is a 19-hectare square, where major city activities will take place in the future.

Right next door is the Hai Phong City Convention and Performance Center with a total investment of more than 2,300 billion VND, which is also being basically completed. The hall has a capacity of up to 1,500 seats, a scale of 3 floors and 1 basement, with a total floor area of ​​nearly 50,000m2. The buildings are all designed with modern glass exterior walls.

Aesthetic outdoor space with green trees, lawns, and lakes.

Everything is ready to receive people to trade.

This center has 2 basement entrances, 4 fire escapes; traffic system, internal roads, parking lot; garden, landscape, trees, water surface; outdoor power supply; outdoor water supply and drainage; lighting, communication system. Internal road system connecting the two buildings, with covered corridors.

Interior inside.

The functional rooms are all modernly designed, with large glass doors extending from ceiling to floor, maximizing natural light, providing a clear view, creating a spacious and comfortable feeling. Since July 1, Hai Duong and Hai Phong have completed the merger, with about 2,600 officials, civil servants, public employees, and workers from the old Hai Duong province moving here to work. The most modern administrative center in the northern coastal provinces has officially come into operation.

Vietnamnet.vn

Source: https://vietnamnet.vn/tru-so-hanh-chinh-sieu-sang-cua-hai-phong-ngay-dau-don-can-bo-nguoi-dan-2416828.html



Comment (0)

No data
No data

Same tag

Same category

Lotus tea - A fragrant gift from Hanoi people
More than 18,000 pagodas nationwide rang bells and drums to pray for national peace and prosperity this morning.
The Han River sky is 'absolutely cinematic'
Miss Vietnam 2024 named Ha Truc Linh, a girl from Phu Yen

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product