Vietnam.vn - Nền tảng quảng bá Việt Nam

Ready to support and help people when they encounter problems

The Ho Chi Minh City Department of Construction requested agencies and units to closely monitor information about the developments of storm No. 3 (Wipha), organize 24/7 on-duty to grasp the situation, and be ready to support and help people when facing difficulties.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng22/07/2025

On the afternoon of July 22, implementing the direction of the Ho Chi Minh City People's Committee to urgently deploy plans and measures to respond to the impact of storm No. 3, the Department of Construction requested agencies and units to closely monitor information on the developments of storm No. 3 and organize 24/7 on-duty to grasp the situation, anticipate the worst possible situations in order to respond promptly, assign forces on duty, and be ready to support and help people when facing difficulties.

22d.jpg
Ready to support and help people when they encounter problems during the rainy and stormy season. Photo: QUOC HUNG

Operation management units, construction units, investors of infrastructure systems and construction works in the city closely coordinate with the People's Committees of wards, communes, special zones, and related units to inspect the drainage system, tide control sluices, tide valves, pumps, and pumping stations to ensure flood prevention for urban areas.

Arrange forces, vehicles, equipment to coordinate with relevant units to take measures to respond to and immediately handle incidents caused by natural disasters (incidents related to drainage systems, fallen trees, damage to lighting systems, road signs, accidents on waterways, roads, construction sites... especially when incidents occur in densely populated areas, headquarters, schools, hospitals, public works) to ensure smooth and safe traffic, minimizing risks and damage to people and property when incidents occur in the City.

The Department of Construction requests agencies and units to arrange forces and means of water and road transport suitable to the City's terrain when natural disasters occur to promptly meet the travel requirements of residents, rescue forces, and relief; Inspect and immediately handle cases of illegal encroachment on the system of rivers, streams, canals, ditches, and public lakes with waterway traffic functions in the City; urgently implement plans to ensure safety for ferries in the City in natural disaster conditions, control safety of water and road traffic in disaster-hit areas; Strengthen inspection of operations at cross-river passenger wharves, passenger pick-up and drop-off wharves and passenger transport vehicles, hydrofoils circulating on local inland waterways and national inland waterways; ensure absolute safety when participating in waterway traffic (vehicles must be inspected, have a communication system, fully equipped with life jackets, life buoys and not overloaded).

Relevant units regularly update and promptly report on incidents, damages and handling situations in response to the impact of storm No. 3.

Source: https://www.sggp.org.vn/san-sang-ho-tro-giup-do-nhan-dan-khi-gap-su-co-post804911.html


Comment (0)

No data
No data
Hanoi is strange before storm Wipha makes landfall
Lost in the wild world at the bird garden in Ninh Binh
Pu Luong terraced fields in the pouring water season are breathtakingly beautiful
Asphalt carpets 'sprint' on North-South highway through Gia Lai
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night

Heritage

Figure

Business

No videos available

News

Political System

Local

Product