Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

From 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.

Implementing the Order of the Head of the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province, from 3:30 p.m. this afternoon (August 23), Ban Ve Hydropower Company will lower the lake water level to welcome floods.

Báo Nghệ AnBáo Nghệ An23/08/2025

Accordingly, Ban Ve Hydropower Company will operate the discharge of water through the project with a flow greater than the flood flow to the lake but not exceeding 1,000 m3/s to gradually lower the lake water level to the elevation of 191.5m.

Previously, in Document No. 186/BCH-PCTT on flood reduction operation orders for downstream areas, Head of the Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense of Nghe An province ordered:

111.jpg
Ban Ve Hydropower Plant reaches flood peak water flow. Photo: Archive

1- The Director of Ban Ve Hydropower Company operates the Ban Ve Hydropower Reservoir to discharge water downstream with a flow greater than the flood flow to the reservoir to gradually lower the reservoir water level, but not lower than the value specified in Table 2 (according to the provisions of Point a, Clause 1, Article 8, Decision No. 1605/QD-TTg dated November 13, 2019 of the Prime Minister ).

2- During operation, if the water level at Con Cuong Hydrological Station exceeds alarm level I but is still below alarm level II or the flow to the lake is from 1,000 m3/s to 1,200 m3/s, then discharge water through the project with a flow rate equal to the flow to the lake to maintain the lake water level.

3- During operation, if a flood occurs causing the flow to the reservoir to increase to over 1,200 m3/s or the water level at Con Cuong Hydrological Station or Cho Trang exceeds alarm level II. The Director of Ban Ve Hydropower Company shall carry out flood reduction operations for downstream areas (according to the provisions of Point c, Clause 1, Article 8, Decision No. 1605/QD-TTg dated November 13, 2019 of the Prime Minister).

During the operation of cutting and reducing floods downstream, if the reservoir water level is likely to reach 200m, the Director of Ban Ve Hydropower Company will gradually adjust the discharge flow through the project so that when the reservoir water level reaches 200m, the discharge flow through the project will equal the flood flow to the reservoir and switch to the mode to ensure the safety of the project.

4- After implementing flood reduction and reduction operations for downstream areas, if the reservoir water level is higher than the value in Table 1 of the Inter-reservoir Process on the Ca River Basin, then implement operations to gradually lower the reservoir water level to the highest pre-flood level specified in Table 1 if the following situations occur: The water level at Con Cuong Hydrological Station has dropped below alert level I; The water level at Con Cuong Hydrological Station is still above alert level I but below alert level II and it is forecasted that a new rainstorm may occur.

5- When the flow to the lake gradually decreases to below 1,000 m3/s and the Department of Hydrometeorology forecasts that in the next 10 days, there will be no weather conditions that can cause heavy rain and floods in the basin in the localities on the Ca River basin, the Director of Ban Ve Hydropower Company will operate under normal conditions.

6- The Departments of Agriculture and Environment, Industry and Trade, and the Standing Office of the Provincial Steering Committee for Natural Disaster Prevention, Search and Rescue and Civil Defense, according to their assigned functions and tasks, inspect and supervise the implementation of the operation order in accordance with regulations, minimizing damage to downstream areas.

Source: https://baonghean.vn/tu-15-gio-30-phut-chieu-nay-23-8-cong-ty-thuy-dien-ban-ve-van-hanh-ha-muc-nuoc-ho-de-don-lu-10305026.html


Comment (0)

No data
No data

Same tag

Same category

Su 30-MK2 fighter jets drop jamming shells, helicopters raise flags in the capital's sky
Feast your eyes on the Su-30MK2 fighter jet dropping a glowing heat trap in the sky of the capital
(Live) General rehearsal of the celebration, parade, and march to celebrate National Day September 2
Duong Hoang Yen sings a cappella "Fatherland in the Sunlight" causing strong emotions

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product