
In Muong Khuong district, National Highway 4, from the center of Muong Khuong town to Tung Chung Pho, Din Chin, and Pha Long communes, suffered landslides at several points. The largest positive slope landslide at Km197+100 (in Tung Chung Pho commune) with a volume of over 1,200 (length 30 m, width 10 m, height of landslide 4 m) buried the entire roadbed, completely cutting off traffic. Currently, the Road Maintenance Management Board (Department of Construction) has deployed machinery and human resources to fix the landslide, and it is expected that 1 lane will be temporarily opened by 11 am.
In Bat Xat district, Provincial Road 156B, the section through Quang Kim commune (from the Noi Bai - Lao Cai expressway overpass to the commune center) is also deeply flooded. Currently, vehicles cannot pass through here.


In Lao Cai city, heavy rain caused Le Thanh street, through group 11, Bac Cuong ward, to be deeply flooded, affecting more than 20 households and completely cutting off traffic.


Currently, the flood situation is still complicated, the risk of flooding and landslides is very high, endangering people's lives; causing traffic jams, affecting the travel and movement of vehicles. Therefore, people need to pay attention to improving prevention and avoidance work.
Lao Cai Newspaper will continue to inform about the flood situation.
Source: https://baolaocai.vn/lao-cai-mua-lon-dien-rong-mot-so-tuyen-giao-thong-bi-sat-lo-va-ngap-ung-post403920.html
Comment (0)