The delegation also included representatives of EVN's professional departments; on the side of Power Generation Corporation 1 (EVNGENCO1), there was the participation of Mr. Tran Nam Trung - Deputy General Director of EVNGENCO1 and representatives of the professional departments of the Corporation. Receiving and working with the inspection delegation, representatives of Da Nhim - Ham Thuan - Da Mi Hydropower Joint Stock Company (DHD Company) included Mr. Le Van Quang - Chairman of the Board of Directors, Mr. Dang Van Cuong - General Director of the Company, along with Deputy General Directors and departments and specialized workshops in the Company.
Mr. Dinh The Phuc - Member of EVN Board of Directors chaired the meeting
At the meeting, the DHD Company reported on the contents related to the management and operation of dams and reservoirs and ensuring the safety of dams and reservoirs, including: Compliance with current legal regulations, information and reporting regimes; Reservoir and inter-reservoir operation procedures; emergency response plans; natural disaster prevention plans for dam works and downstream areas ; Dam and reservoir protection plans; Inspection, maintenance, repair and upgrading of dam and reservoir works; Dam, reservoir and downstream monitoring and operation monitoring systems, warning systems for power generation operations and flood discharge operations in downstream areas ; Coordination with local authorities in information, warning and incident response work, etc.
EVN and EVNGENCO1 working group inspected the dam and reservoir of the General Assembly.
Through field inspection and examination of documents and reports, Mr. Dinh The Phuc highly appreciated the sense of responsibility of the DHĐ Company in the management and safe operation of dams and reservoirs. The Da Nhim - Ham Thuan - Da Mi Hydropower Joint Stock Company has fully implemented the provisions of the law on the management of dam and hydropower reservoir safety, meeting management requirements. He requested the Company to continue to review and update the coordination regulations with factories on the Dong Nai river basin ladder to ensure the safety of dams and reservoirs; review emergency response plans and disaster prevention plans in line with the actual situation, continue to maintain and strengthen internal inspections and technical supervision. In addition, the Company needs to continue to strengthen communication work, coordinate with localities in the management and operation of dams, reservoirs and disaster prevention; continue to organize drills on disaster prevention and search and rescue in line with the actual situation; Coordinate with local authorities to ensure safety of flood escape corridors,...
On behalf of the DHĐ Company, Mr. Le Van Quang - Chairman of the Board of Directors of the Company expressed his gratitude to the leaders of EVN and EVNGENCO1 for their attention and close direction in the management of dam and reservoir safety. He pledged that the Company will fully comply with the provisions of law in the management and operation of dams and reservoirs; the Company will continue to promote the highest sense of responsibility in management and operation, ensuring absolute safety for works, dams and downstream areas, contributing to the sustainable development of the DHĐ Company and of Power Generation Corporation 1, Vietnam Electricity Group.
Source: https://baobinhthuan.com.vn/doan-cong-tac-cua-evn-kiem-tra-cong-tac-quan-ly-an-toan-cac-dap-thuy-dien-tai-cong-ty-co-phan-thuy-dien-da-nhim-ham-thuan-da-mi-130835.html
Comment (0)