Vietnam.vn - Nền tảng quảng bá Việt Nam

How do drivers feel when Tra Khuc 2 bridge reopens after 2 months of repair?

Báo Giao thôngBáo Giao thông15/09/2024


Previously, in 2023, the authorities inspected and determined that many cracks appeared inside the Super T girder spans in the 5 main spans in the middle of the river and the Vietnam Road Administration approved a major repair policy. In early July, the repair work was carried out, the authorities officially "closed" the bridge to traffic for construction, the duration was 100 days, expected to be completed and put back into operation from September 14.



Source: https://www.baogiaothong.vn/tai-xe-cam-nhan-ra-sao-khi-cau-tra-khuc-2-thong-xe-tro-lai-sau-2-thang-sua-chua-192240915124807802.htm

Comment (0)

No data
No data
PIECES of HUE - Pieces of Hue
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?

Heritage

Figure

Business

No videos available

News

Political System

Local

Product