Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Thanh Mien invested over 31 billion VND to renovate and upgrade

Việt NamViệt Nam24/04/2024

img_9481.jpeg
The construction unit is carrying out the roadbed construction for the project to renovate and upgrade provincial road 392B through Thanh Mien town.

The project to renovate and upgrade provincial road 392B has a total length of 1.7 km, passing through Lam Son commune and Thanh Mien town. The total investment capital of the project is over 31 billion VND from the district budget.

After upgrading and renovating, the road surface will be 10.5 m wide instead of 6 m as before. In addition, this route will also be built with a drainage system, sidewalks and trees to create a landscape. Currently, the construction unit is carrying out the embankment, constructing longitudinal ditches, drainage culverts and paving sidewalks...

The project started on January 15 and is expected to be completed in the third quarter of 2024.

DQ

Source

Tag: crown

Comment (0)

No data
No data

Same tag

Same category

Summary of A80 training: Vietnam's strength shines under the night of the thousand-year-old capital
Hanoi traffic chaos after heavy rain, drivers abandon cars on flooded roads
Impressive moments of the flight formation on duty at the A80 Ceremony
More than 30 military aircraft perform for the first time at Ba Dinh Square

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product