Vietnam.vn - Nền tảng quảng bá Việt Nam

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years

Báo Tiền PhongBáo Tiền Phong12/03/2025

TPO - The project was approved and implemented by Hanoi City from 2010 to 2013, but 15 years have passed, and the project to renovate and upgrade 4.8 km of National Highway 1, Ngoc Hoi - Van Dien section, is still under construction, causing dust, traffic jams and seriously affecting people's lives.


TPO - The project was approved and implemented by Hanoi City from 2010 to 2013, but 15 years have passed, and the project to renovate and upgrade 4.8 km of National Highway 1, Ngoc Hoi - Van Dien section, is still under construction, causing dust, traffic jams and seriously affecting people's lives.

CLIP Construction site of upgrading National Highway 1, Ngoc Hoi - Van Dien section.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 1

To reduce traffic congestion and avoid overloading the Phap Van - Cau Gie expressway during peak times in 2009, the Hanoi People's Committee approved the project to upgrade National Highway 1, Ngoc Hoi - Van Dien section, 4.8 km long.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 2

The project will expand and upgrade the road surface of National Highway 1 from 2 to 4 lanes in each direction in the direction of Thuong Tin - Van Dien and was assigned to the Department of Transport, then from 2018, the Hanoi Traffic Construction Investment Project Management Board took over and continued to implement with a budget of 887 billion VND. Photo of a section of the project completed on March 11, 2025.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 3

However, up to now - after 15 years of implementation (12 years behind schedule), 70% of the project length has not been completed, the construction site is still messy and divided into many sections.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 4

Currently, the road from Agricultural Hospital (Ngoc Hoi Commune, Thanh Tri) to Ngoc Hoi Cemetery, about 2km long, is under construction like this.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 5

Some housing projects within the project area have not yet been cleared.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 6

The project includes investment items, construction of new ditch systems, drainage culverts... but up to now the drainage culverts have not been completed, when it rains, the roadbed of National Highway 1 and the project area are flooded because the rainwater has no way to drain.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 7

Traffic on National Highway 1A from Thuong Tin to Van Dien is often congested due to narrow roads and unfinished construction sites.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 8

People in Ngoc Hoi commune, Thanh Tri are having to live and work on the project construction site.

Renovation of 4.8 km of Hanoi gateway road not completed after 15 years photo 9

Many families living along National Highway 1 where there has been a construction project for many years have no road to their homes, so they have had to build temporary embankments (red line) to get around.

Mr. Trong



Source: https://tienphong.vn/cai-tao-48-km-duong-cua-ngo-ha-noi-15-nam-chua-xong-post1724250.tpo

Comment (0)

No data
No data
Magical scene on the 'upside down bowl' tea hill in Phu Tho
3 islands in the Central region are likened to Maldives, attracting tourists in the summer
Watch the sparkling Quy Nhon coastal city of Gia Lai at night
Image of terraced fields in Phu Tho, gently sloping, bright and beautiful like mirrors before the planting season
Z121 Factory is ready for the International Fireworks Final Night
Famous travel magazine praises Son Doong cave as 'the most magnificent on the planet'
Mysterious cave attracts Western tourists, likened to 'Phong Nha cave' in Thanh Hoa
Discover the poetic beauty of Vinh Hy Bay
How is the most expensive tea in Hanoi, priced at over 10 million VND/kg, processed?
Taste of the river region

Heritage

Figure

Business

No videos available

News

Political System

Local

Product