Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Storm No. 5 causes heavy rain, Ky Thuong commune is partially isolated

(Baohatinh.vn) - Due to the impact of storm No. 5, heavy to very heavy rain occurred in Ky Thuong commune (Ha Tinh). The bridge and traffic system was deeply flooded, many places were partially isolated.

Báo Hà TĩnhBáo Hà Tĩnh25/08/2025

bqbht_br_16.jpg
Son Thuong route through Khe Vuon bridge is divided.

Heavy rains have flooded 7 bridges and culverts, many places are deeply flooded, partially isolated, and cannot be used for traffic, including: Cao Su bridge (My Thuan village), Khe Bui bridge (Phuc Lap village), Khe Vuon Loi Troi bridge, Loi Troi culvert (Phuc Mon village), Khe Tho bridge (Phuc Lap village), Ben Xat bridge, Tran bridge (My Thuan village); Dam Bau lake (Phuc Mon village) is rising; the lighting power line (Son Trung 2 village) is broken.

bqbht_br_11.jpg
Water begins to rise at Ben Xat bridge in My Thuan village

In addition, many areas of summer-autumn rice and crops were overturned and flooded. Some inter-village roads and bridges were flooded, at risk of being cut off. In streams and mountainous areas, there were landslides and flash floods that were potentially dangerous.

bqbht_br_14.jpg
Ky Thuong commune posted danger warning signs..

Mr. Nguyen Cao Cuong - Chairman of Ky Thuong Commune People's Committee said: "In the face of the complicated developments of storm No. 5, the commune has been on duty 24/7, promptly grasping the situation, directing villages to monitor the storm's developments and reporting immediately when incidents occur.

The commune has established 4 rapid response teams (each team has 3-4 people), the main means of transport are motorbikes, when necessary, specialized cars are mobilized to move to key points. The teams have inspected key points and affected areas, promptly directed handling and remediation.

bqbht_br_18.jpg
The commune arranged forces on duty, not allowing people and vehicles to pass through flooded areas.

At the same time, warning signs were put up and forces were deployed at deeply flooded areas such as Cao Su Bridge (My Thuan), Khe Bui Bridge (Phuc Lap), Bu Dut Bridge, and Khe Vuon Bridge to guide and prevent people from passing.

bqbht_br_13.jpg
Ky Thuong Commune supported the evacuation of 129 households to safety.

The commune directed Son Trung 2 village to urgently fix the tilted lighting poles to avoid the risk of electrical safety. At the same time, mobilize militia, police and people to set up barriers at traffic intersections that are cut off, and prepare rescue vehicles and supplies."

Source: https://baohatinh.vn/bao-so-5-gay-mua-to-xa-ky-thuong-bi-chia-cat-cuc-bo-post294336.html


Comment (0)

No data
No data

Same tag

Same category

Summary of A80 training: Vietnam's strength shines under the night of the thousand-year-old capital
Hanoi traffic chaos after heavy rain, drivers abandon cars on flooded roads
Impressive moments of the flight formation on duty at the A80 Ceremony
More than 30 military aircraft perform for the first time at Ba Dinh Square

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product