Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Building an overpass on National Highway 1, connecting to Phan Thiet Expressway

Báo Giao thôngBáo Giao thông18/10/2024


On October 18, Mr. Dang Hung Thai, Director of the Phan Thiet - Dau Giay Expressway Management Board, said that the Ministry of Transport has approved the construction of an overpass at the Ba Bau intersection on National Highway 1 (QL1) to supplement the Phan Thiet - Dau Giay Expressway project.

Xây cầu vượt trên QL1, kết nối cao tốc Phan Thiết - Dầu Giây- Ảnh 1.

Ba Bau intersection connects National Highway 1 with Phan Thiet - Dau Giay expressway.

Accordingly, the design solution for Phan Thiet intersection is to add a right turn from the highway with a length of 1.2km. The scale is two lanes, the road surface is 7m wide, the right shoulder is 3m wide and the left shoulder is 1m wide.

For the intersection connecting to National Highway 1 (Ba Bau intersection), it is adjusted to an intersection with four branches entering and exiting National Highway 1 from the connecting route and the new Ham Kiem - Tien Thanh route (expressway connecting road), each branch has two lanes.

Build an overpass on National Highway 1 with four lanes, arrange a roundabout under the overpass and expand the existing Suoi Sop bridge.

Add some service roads with rural traffic scale and add horizontal and vertical drainage systems.

Previously, the People's Committee of Binh Thuan province proposed to build an additional overpass at Ba Bau intersection to relieve traffic conflicts.

The solution proposed by this province is to soon invest in building an overpass on National Highway 1, the section passing through Ba Bau intersection (at Km1717+593, Ham Kiem commune).

At the same time, open a right turn branch road, in the direction from Dau Giay to Phan Thiet before reaching Ba Bau intersection, to regulate the flow of vehicles entering and exiting the highway for safer and more convenient travel.



Source: https://www.baogiaothong.vn/xay-cau-vuot-tren-ql1-ket-noi-cao-toc-phan-thiet-dau-giay-192241018193008297.htm

Comment (0)

No data
No data

Same tag

Same category

Impressive moments of the flight formation on duty at the A80 Ceremony
More than 30 military aircraft perform for the first time at Ba Dinh Square
A80 - Rekindling a proud tradition
The secret behind the nearly 20kg trumpets of the female military band

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product