Vietnam.vn - Nền tảng quảng bá Việt Nam

Why does Tra Khuc 2 bridge through Quang Ngai have to be "closed" for 2 months?

Báo Giao thôngBáo Giao thông17/07/2024


In addition to traffic direction guidance, at the construction site at both ends of Tra Khuc 2 Bridge, the contractor will install traffic lights, encourage sand pouring on both sides of the bridge, and create obstacles to increase vigilance for vehicles traveling at night, and prevent reckless overtaking when moving to the bridge. At the same time, at important intersections, relevant agencies will arrange for people to be on duty regularly, guiding and directing traffic for heavy vehicles, and will not be allowed to enter routes outside the traffic planning.



Source: https://www.baogiaothong.vn/vi-sao-cau-tra-khuc-2-qua-quang-ngai-phai-dong-cua-trong-2-thang-192240716171644766.htm

Comment (0)

No data
No data

Same tag

Same category

Discover the process of making the most expensive lotus tea in Hanoi
Admire the unique pagoda made from more than 30 tons of ceramic pieces in Ho Chi Minh City
Village on the mountain top in Yen Bai: Floating clouds, beautiful like a fairyland
Village hidden in the valley in Thanh Hoa attracts tourists to experience

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product