Vietnam.vn - Nền tảng quảng bá Việt Nam

Nha Trang - Cam Lam and Vinh Hao - Phan Thiet Expressways open to traffic 3 days before

VnExpressVnExpress15/05/2023


Equipment trucks are completing the final stages on the main highway section through Thuan Minh commune, Ham Thuan Bac district.

Like the Dau Giay - Phan Thiet expressway, some items such as the residential access road will be completed after the project is inaugurated. Because it is invested by the state budget, the Vinh Hao - Phan Thiet expressway and 8 sections of the North - South expressway are being proposed by the Ministry of Transport to pilot toll collection. The pilot period is 5 years from the date the plan is approved by the National Assembly .

After the two expressways Nha Trang - Cam Lam and Vinh Hao - Phan Thiet are put into operation, the travel time from Ho Chi Minh City to Nha Trang (over 420 km) will be significantly shortened. Of the five expressway sections (Ho Chi Minh City - Dau Giay, Dau Giay - Phan Thiet, Vinh Hao - Phan Thiet, Cam Lam - Vinh Hao, Nha Trang - Cam Lam), only the Cam Lam - Vinh Hao section (over 78 km long) has not been completed.



Source link

Comment (0)

No data
No data

Same tag

Same category

Beautiful sunrise over the seas of Vietnam
The majestic cave arc in Tu Lan
Lotus tea - A fragrant gift from Hanoi people
More than 18,000 pagodas nationwide rang bells and drums to pray for national peace and prosperity this morning.

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product