Vietnam.vn - Nền tảng quảng bá Việt Nam

1,500 billion VND to build 2 aircraft maintenance projects at Long Thanh airport

The Ministry of Construction has just announced that the investment project to build and operate aircraft maintenance services No. 3 and No. 4 at Long Thanh International Airport has a total investment of more than 1,500 billion VND.

Báo Sài Gòn Giải phóngBáo Sài Gòn Giải phóng23/06/2025

1,500 billion VND to build 2 aircraft maintenance facilities at Long Thanh airport

The project aims to form a modern aircraft maintenance complex to serve domestic airlines, ensuring national interests and requirements for phase 1 exploitation of Long Thanh airport.

The project is designed to simultaneously maintain at least 2 code E aircraft (wingspan from 52m to 65m); 4 code C aircraft (wingspan from 36m to 52m).

Construction items include operator house, equipment system, synchronous technical infrastructure and auxiliary works.

The expected construction investment period is in the period of 2025 - 2026, and exploitation until December 31, 2050.

The selection of investors will be carried out on a case-by-case basis. The Ministry of Construction assigns the Civil Aviation Authority of Vietnam to prepare, appraise and approve the dossier to ensure the selection of the right investor with the capacity, experience and appropriate solutions to effectively implement the project.

Source: https://www.sggp.org.vn/1500-ty-dong-xay-dung-2-cong-trinh-bao-duong-may-bay-tai-san-bay-long-thanh-post800645.html


Comment (0)

No data
No data
Mission A80: 'Stormy' from the rehearsal night to the heroic National Day song September 2nd
Overcoming the sun and rain, practicing for the national festival
Southeast Asian newspapers comment on the resounding victory of the Vietnamese women's team
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product