Vietnam.vn - Nền tảng quảng bá Việt Nam

Approval of construction of the route connecting Noi Bai - Lao Cai expressway with Tuyen Quang - Phu Tho expressway

Việt NamViệt Nam08/06/2024

Tuyen Quang - Phu Tho Expressway through Tuyen Quang province.

The project starts from the connection point of Tuyen Quang - Phu Tho expressway and ends at the existing Ho Chi Minh road, with a total length of 2,736 km, including two main items: Main expressway and service road.

Accordingly, the design speed is 100km/h, investment in expanding 2 lanes on the left side of the existing road, ensuring the completed scale of 4 lanes, roadbed width of 24.75m. The service road is invested in at least the scale of a grade B rural road, roadbed width of 5m, road surface width of 3.5m.

According to the plan, the project will be implemented within 2 years, with main items including: Construction of road surface, drainage system, overpass and other auxiliary works. In particular, the project also focuses on environmental protection, using advanced construction technologies and environmentally friendly materials.


Source

Comment (0)

No data
No data

Same tag

Same category

The majestic cave arc in Tu Lan
The plateau 300km from Hanoi has a sea of ​​clouds, waterfalls, and bustling visitors.
Braised Pig's Feet with Fake Dog Meat - A Special Dish of Northern People
Peaceful mornings on the S-shaped strip of land

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product