Vietnam.vn - Nền tảng quảng bá Việt Nam

The competent authority decides on traffic flow.

Việt NamViệt Nam25/11/2024


2(2).jpg
Actual inspection at Dak Mi 1 bridge this afternoon. Photo: NB

Accordingly, passenger vans with 16 seats or less and vehicles weighing 5 tons or less, along with motorbikes, rudimentary vehicles, and pedestrians are allowed to travel through Dak Mi 1 bridge. Other vehicles travel according to the following instructions: From Phuoc Son to National Highway 1 and vice versa, follow Ho Chi Minh Road ↔ National Highway 14B (Thanh My town, Nam Giang) ↔ National Highway 1; from National Highway 1 to Phuoc Son and vice versa at km972+200 of National Highway 1, follow National Highway 14E to km58+530/National Highway 14E ↔ follow Truong Son Dong Road (about 48km) ↔ Ho Chi Minh Road.

The Department of Transport requested Project Management Board 4 (Vietnam Road Administration) to install traffic flow control signs at intersections between National Highway 14E and Da Nang - Quang Ngai Expressway, Ho Chi Minh Road and DT611 Route. Quang Nam Transport Construction Joint Stock Company installed traffic flow control signs at intersections between National Highway 14E and National Highway 1, DT614 Route and Truong Son Dong Road.

The Department of Transport has also requested Project Management Board 4 to urgently repair the damaged Dak Mi 1 bridge to ensure smooth and safe traffic on National Highway 14E.

1(2).jpg
Large rocks collapsed from the positive slope, damaging the bridge. Photo: NB

Previously, on the morning of November 25, Project Management Board 4 sent a quick report to the People's Committee of Quang Nam province, the Vietnam Road Administration and the Quang Nam Department of Transport about the deviation of the Dak Mi 1 bridge deck due to the impact of local heavy rains. Project Management Board 4 (the unit assigned to manage the project to renovate and upgrade National Highway 14E) said that due to the impact of local heavy rains in recent days, the positive slope at the location of km85+400 (behind the tail of M2 pier of Dak Mi 1 bridge) collapsed, dragging rocks and soil with it. The huge orphaned rock rolled down, causing the bridge deck system of span 3 of Dak Mi 1 bridge to shift by about 47cm.



Source: https://baoquangnam.vn/cau-dak-mi-1-tren-quoc-lo-14e-bi-su-co-nganh-chuc-nang-quyet-dinh-phan-luong-giao-thong-3144803.html

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product