Vietnam.vn - Nền tảng quảng bá Việt Nam

Hanoi approves plans for 3 key intersections of Ring Road 3.5

The Hanoi People's Committee has just issued Decision No. 3852/QD-UBND on approving the Plan and location of 3 traffic intersections between the 3.5 beltway and the southern axis road; National Highway 1A and the Phap Van-Cau Gie expressway, scale 1/500.

Báo Đầu tưBáo Đầu tư29/12/2024

According to the Decision, the locations of the 3 traffic intersections are in the communes of Thanh Tri, Nam Phu, Dai Thanh and the wards of Kien Hung and Phu Luong: The intersection with the southern axis road is a modified asterisk-shaped level-separated intersection, fully arranged with branches for all directions;

Intersection with National Highway 1A: direct grade-separated intersection, construction of overpass on Ring Road 3.5 to ensure clearance of existing railway and National Highway 1A;

The intersection with Phap Van-Cau Gie expressway uses an asterisk shape, without a left turn from Ring Road 3.5 to Phap Van.

The red line boundary of 3 traffic intersections is determined according to technical parameters and control conditions; detailed design content within the boundary will be specified in the approved construction investment project.

Hanoi City People's Committee assigns: Hanoi Department of Planning and Architecture to be responsible for checking and confirming the 1/500 scale drawing documents. Updating approved content into relevant plans; City Civil Construction Investment Project Management Board: Takes the lead in publicly announcing the approved plan.

Hand over the documents to the People's Committees of the communes and wards: Thanh Tri, Nam Phu, Dai Thanh, Kien Hung, Phu Luong and related agencies. Coordinate with the Ministry of Construction ; Ministry of Culture, Sports and Tourism... to ensure compliance with specialized regulations. The People's Committees of the above communes and wards manage construction according to the planning.

Inspect and handle cases of construction works violating planning according to authority and regulations of law.

Source: https://baodautu.vn/ha-noi-duyet-phuong-an-3-nut-giao-trong-diem-vanh-dai-35-d335099.html


Comment (0)

No data
No data
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product