Vietnam.vn - Nền tảng quảng bá Việt Nam

Installing the "giant backbone" roof of Long Thanh airport's super terminal

Báo Giao thôngBáo Giao thông14/12/2024

To date, the installation of the station's roof steel structure has reached nearly half of its capacity. Engineers and workers have installed about 12,694 tons of steel. ACV is urging and directing contractors to take advantage of the dry season weather to speed up the progress, especially the central roof section.


In fact, the steel frames are processed, manufactured, completed and then transported to the construction site for installation. Mr. Nguyen Van Tu shared that at first, when he saw the giant steel frames, he was quite worried. However, now that he is used to the job, everything has become easier. "Installing the roof steel structure is a very important step, requiring high precision, meticulousness, strictness, and following the correct process to ensure quality and safety during construction," said Mr. Tu.



Source: https://www.baogiaothong.vn/lap-dan-xuong-song-khung-mai-nha-ga-sieu-san-bay-long-thanh-192241214134451711.htm

Comment (0)

No data
No data
Southeast Asian newspapers comment on the resounding victory of the Vietnamese women's team
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product