Vietnam.vn - Nền tảng quảng bá Việt Nam

Construction of the project to upgrade and expand National Highway 28B will begin at the end of March.

Việt NamViệt Nam20/03/2024


BTO - According to information from Project Management Board 5 (the project management unit), the project to upgrade and expand National Highway 28B, 69 km long, through Binh Thuan province (51 km) and Lam Dong province (18 km), is expected to start construction at the end of March 2024.

This project has a total investment of more than 1,400 billion VND from the state budget, a roadbed width of 12 m, a road surface of 11 m, a design speed of 60 - 80 km/h, and is expected to be completed in 2026.

z4580554207770_4b564b3a3e19641e24b46ce9ef04c596-4-.jpg
National Highway 28B. Photo courtesy

National Highway 28B connecting the two provinces of Binh Thuan - Lam Dong is currently seriously degraded and does not ensure traffic safety. People want to soon upgrade and expand National Highway 28B to strengthen the connection between the three tourist centers of Ho Chi Minh City - Binh Thuan - Lam Dong, after the expressway from Dau Giay - Vinh Hao is built.


Source

Comment (0)

No data
No data
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product