Vietnam.vn - Nền tảng quảng bá Việt Nam

Độc lập - Tự do - Hạnh phúc

Adjusting the architectural space of the center of Tay Ho Tay Urban Area

The Hanoi People's Committee has just approved the project to partially adjust the detailed planning of the center of Tay Ho Tay Urban Area, scale 1/500 at land lot C1-CC3. The goal is to reorganize the architectural space, landscape, underground works, and determine the functions including offices, commercial services and general culture.

Thời ĐạiThời Đại07/09/2025

The adjustment is made on the principle of maintaining the location, boundaries, land use functions and architectural planning indicators such as land area, construction area, density, land use coefficient, height of floors, and total floor area.

These factors are consistent with the approved master plan adjustment project for the detailed planning of the West Lake Urban Area center at a scale of 1/500.

The planning ensures synchronous and consistent connection with the general social and technical infrastructure of the area; does not change the traffic system and technical infrastructure framework identified in the overall adjustment plan and the 1/2000 scale H2-1 subdivision plan. Implementation complies with QCVN 01:2021/BXD, specialized design standards and related regulations.

phối cảnh khu đo thị tây hồ Tây (Ảnh: T.L)
Perspective of West Lake Urban Area. (Photo: TL)

According to the adjustment, land lot C1-CC3 is more than 1 hectare wide, belongs to the group of public land at the city - regional level, and is planned to build office, commercial service, and cultural complex buildings.

The architectural space requires a modern layout, maximum 35 floors above ground, harmoniously connected with neighboring projects. Construction boundaries, setbacks, height of the base and tower all comply with QCVN 01:2021/BXD. Urban trees are selected according to the right species, suitable for nature and landscape. Encourage the use of LED lights, solar energy and exploitation of night lighting art, including lighting of buildings, streets, trees, and gardens.

Regarding technical infrastructure, the planning complies with the overall adjustment plan. The basement parking area is arranged to be over 2.3 hectares, with charging stations for electric vehicles, transformer stations and local wastewater treatment systems. The underground space is built with 3 basements, with a total floor area of ​​over 3.2 hectares. The basement area coincides with the red line and the land plot boundary.

The City People's Committee assigned the Hanoi Department of Planning and Architecture to check, confirm the documents and update the overall documents. The Xuan Dinh Ward People's Committee publicly announced the adjusted contents and supervised the construction.

The investor - THT Development Company Limited - carries out investment and construction procedures according to the planning, ensuring financial obligations and legal procedures on land, investment and construction. Relevant departments and branches inspect and guide the correct implementation of specialized regulations.

Source: https://thoidai.com.vn/dieu-chinh-khong-gian-kien-truc-trung-tam-khu-do-thi-tay-ho-tay-216156.html


Comment (0)

No data
No data

Same tag

Same category

Tourists flock to Y Ty, immersed in the most beautiful terraced fields in the Northwest
Close-up of rare Nicobar pigeons at Con Dao National Park
Fascinated by the colorful coral world under the sea of ​​Gia Lai through Freediving
Admire the collection of ancient Mid-Autumn lanterns

Same author

Heritage

Figure

Enterprise

No videos available

News

Political System

Destination

Product