Vietnam.vn - Nền tảng quảng bá Việt Nam

Traffic 'trap' on the trillion-dollar coastal road

Báo Thanh niênBáo Thanh niên28/02/2024


"The road surface of this section is about 7 meters wide and is only paved with a layer of asphalt concrete. After a long time of use, due to the large traffic volume, especially vehicles running on the North-South route and heavy-duty trucks continuously transporting materials to and from the quarry in Ky Bac commune, the road has been damaged. Currently, the Provincial People's Committee has also approved an investment plan of more than 20 billion VND to repair the damage on the damaged sections, but due to the bidding procedures for selecting a consulting and design unit, it has not been possible to implement it yet," Mr. Tung shared.



Source link

Comment (0)

No data
No data
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground
Watch helicopters rehearse in the sky of Hanoi in preparation for National Day September 2
U23 Vietnam radiantly brought home the Southeast Asian U23 Championship trophy
Northern islands are like 'rough gems', cheap seafood, 10 minutes by boat from the mainland
The powerful formation of 5 SU-30MK2 fighters prepares for the A80 ceremony

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product