Vietnam.vn - Nền tảng quảng bá Việt Nam

Inspecting disaster prevention and control work at Lam Dong Aluminum Company

On August 7, a working delegation from the Ministry of Industry and Trade inspected disaster prevention and control (PD) and dam safety at component projects of Lam Dong Aluminum Company Limited - TKV.

Báo Lâm ĐồngBáo Lâm Đồng07/08/2025

Lam Dong Aluminum 1
The Working Group surveyed areas related to natural disaster risk prevention work of Lam Dong Aluminum Company - TKV

The delegation directly surveyed and assessed the current status of 8 red mud storage tanks, 2 tailings storage tanks and areas related to natural disaster risk prevention. The delegation also inspected production and operation activities at Tan Rai Alumina Factory.

As of July 2025, the company has basically completed the 2025 PCTT plan. The volume of excavation and dredging of the drainage system has reached about 3,420m3 of various types of mud and soil.

Lam Dong Aluminum
Reality at the production area of Tan Rai Alumina Factory

The company has implemented disaster prevention and control work with a total value of more than 7.2 billion VND, equivalent to 148% of the 2024 plan due to storm incidents.

Reporting to the working delegation, the representative of Lam Dong Aluminum Company Limited - TKV said that the unit officially came into operation on October 1, 2010, taking over the operation of the Lam Dong Bauxite - Aluminum Complex Project invested and built by the Vietnam National Coal - Mineral Industries Group (TKV).

Aluminum 1
The refined ore output of Lam Dong Aluminum Company - TKV reaches about 1.77 million tons/year.

The company is currently exploiting about 4.3 million tons of raw bauxite ore/year. The output of refined ore after selection is about 1.77 million tons/year. The alumina plant has a designed capacity of 650,000 tons/year.

This inspection aims to comprehensively evaluate measures to ensure reservoir safety, respond to natural disasters and production activities at one of the key national projects. Thereby, ensuring economic development without sacrificing environmental safety.

group.jpg
As of July 2025, Lam Dong Aluminum Company - TKV basically completed the 2025 disaster prevention and control plan.

Revenue in the first 6 months of the year of Lam Dong Aluminum Company Limited - TKV reached 1,985 billion VND, equal to 57.7% of the yearly plan. In particular, the company continues to ensure high income for employees, with an average salary of about 20.5 million VND/person/month.

Source: https://baolamdong.vn/kiem-tra-cong-tac-phong-chong-thien-tai-tai-cong-ty-nhom-lam-dong-386710.html


Comment (0)

No data
No data
Southeast Asian newspapers comment on the resounding victory of the Vietnamese women's team
Wild beauty on Ha Lang grass hill - Cao Bang
Vietnam Air Force practices preparing for A80
Missiles and combat vehicles 'Made in Vietnam' show off their power at A80 joint training session
Admire the million-year-old Chu Dang Ya volcano in Gia Lai
It took Vo Ha Tram 6 weeks to complete the music project praising the Fatherland.
Hanoi coffee shop is bright with red flags and yellow stars to celebrate the 80th anniversary of National Day September 2nd
Wings flying on the A80 training ground
Special pilots in the flying formation to celebrate National Day September 2
Soldiers march through the hot sun on the training ground

Heritage

Figure

Business

No videos available

News

Political System

Destination

Product